{"id":252048,"date":"2020-07-28T12:37:20","date_gmt":"2020-07-28T10:37:20","guid":{"rendered":"https:\/\/encours.studiottt.com\/anma21\/projects\/gare-de-creteil-lechat\/"},"modified":"2025-06-09T16:01:43","modified_gmt":"2025-06-09T14:01:43","slug":"gare-de-creteil-lechat","status":"publish","type":"project","link":"https:\/\/anma.fr\/en\/projects\/gare-de-creteil-lechat\/","title":{"rendered":"Gare de Cr\u00e9teil l&#8217;\u00c9chat"},"content":{"rendered":"<div class=\"et-l et-l--post\">\n\t\t\t<div class=\"et_builder_inner_content et_pb_gutters3\"><div id=\"project note\" class=\"et_pb_section et_pb_section_0 et_section_regular\" >\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_row et_pb_row_0\">\n\t\t\t\t<div class=\"et_pb_column et_pb_column_4_4 et_pb_column_0 carousel-container  et_pb_css_mix_blend_mode_passthrough et-last-child\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_0 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/\u00a9Nicolas-Grosmond-CREtEIL-LECHAT_ANMA-FEV2025-09853.jpg\" alt=\"CLE\" title=\"CLE site parvis\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_0 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><b>a lever for<\/b>urban renewal <b><br \/><\/b><\/h2>\n<p>&nbsp;<\/p>\n<p>In connection with the Cr\u00e9teil subway station, the new Grand Paris Express Cr\u00e9teil-\u00c9chat station will allow an urban redevelopment of a sector suffering from a lack of programmatic diversity and a predominance of road infrastructure.<\/p>\n<p>In addition to the multiplicity of access to the various city&#8217;s facilities, such as the Henri Mondor hospital, connections between the \u00c9chat district and the areas further west of the hill will be created. The capacity to spread flows from the station to the hospital and the Paris-Est Cr\u00e9teil University, to the west of the subway route, and to the office buildings and annexes of the university to the west, will be redesigned. The area around the station will become a gathering place, developed as a new public space on a human scale.<\/p>\n<p>As a new urban landmark, the square will become the recognizable meeting point for adjoining buildings and their interstices. Bordered by active ground floors, it will replace the neighborhood scale to match that of the pedestrian. The existing underground shopping mall will emerge in the volume of the station and will highlight this active continuity.<\/p><\/div>\n\t\t\t<\/div><div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_1 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" width=\"1527\" height=\"1080\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-e-150609-a3-plasticine.jpg\" alt=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" title=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" srcset=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-e-150609-a3-plasticine.jpg 1527w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-e-150609-a3-plasticine-1280x905.jpg 1280w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-e-150609-a3-plasticine-980x693.jpg 980w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-e-150609-a3-plasticine-480x339.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1527px, 100vw\" class=\"wp-image-233304\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_1 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><b>a new<br \/> passageway<\/b>on the first floor<\/h2>\n<p>&nbsp;<\/p>\n<p>The new subway station is attached to an existing office building as well as to the hillock of metro line 8, under which a passage on the the ground floor is open. As a direct extension of rue Leonhard Euler, this link, visible from avenue du G\u00e9n\u00e9ral de Gaulle, fits well into the existing fabric. This is a breakthrough serving the interests of the civil engineering structure and allowing continuity of public space towards the new forecourt and strengthening its central position.<\/p><\/div>\n\t\t\t<\/div><div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_2 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/\u00a9Nicolas-Grosmond-CREtEIL-LECHAT_ANMA-FEV2025-09541.jpg\" alt=\"CLE\" title=\"CLE CHANTIER\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_2 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><b><br \/> in<\/b>shades of white<\/h2>\n<p>&nbsp;<\/p>\n<p>The Cr\u00e9teil l&#8217;\u00c9chat station is made up of a succession of 3 orthogonal volumes &#8211; gallery, descent, platform box &#8211; which allow the Grand Paris Express to travel to the elevated platforms of line 8.<\/p>\n<p>Its architecture, light and transparent, strives to develop consistent neutral and homogeneous spaces to unite distant programmatic elements. The traveler will walk in a peaceful space, with materials and colors in shades of white, very soothing and revealed by an omnipresent natural light, from the traffic to the platforms.<\/p>\n<p>&nbsp;<\/p><\/div>\n\t\t\t<\/div><div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_3 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" width=\"1528\" height=\"1080\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-f-150527-a3-plasticine.jpg\" alt=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" title=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" srcset=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-f-150527-a3-plasticine.jpg 1528w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-f-150527-a3-plasticine-1280x905.jpg 1280w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-f-150527-a3-plasticine-980x693.jpg 980w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-f-150527-a3-plasticine-480x339.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1528px, 100vw\" class=\"wp-image-233301\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_3 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><b>roofing<\/b> origami<\/h2>\n<p>&nbsp;<\/p>\n<p>Around the square, the light and transparent volumes of the station are covered with a pleated roof. Like a new topography, this 5th facade presents itself as a landmark at the neighborhood level. It unfolds like an origami, from inside the station to the mezzanine of the platforms. On the underside, it ensures a continuity of path between the volumes and the pleasing acoustic of the whole.<\/p>\n<p>The hall functions as a large urban gallery connecting the two stations, opening onto the open square and displaying the subways&#8217; course, visible from the ground.<\/p>\n<p>&nbsp;<\/p><\/div>\n\t\t\t<\/div><div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_4 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" width=\"1528\" height=\"1080\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-c-150609-a3-plasticine.jpg\" alt=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" title=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" srcset=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-c-150609-a3-plasticine.jpg 1528w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-c-150609-a3-plasticine-1280x905.jpg 1280w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-c-150609-a3-plasticine-980x693.jpg 980w, https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/anma-cle-c-150609-a3-plasticine-480x339.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1528px, 100vw\" class=\"wp-image-233302\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_4 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><strong>PROJECT<\/strong> TEAM<\/h2>\n<p>&nbsp;<\/p>\n<p><strong>MA\u00ceTRISE<\/strong> <strong>D&#8217;OEUVRE<br \/><\/strong>ANMA Architecte<br \/>Group leader, fluids, structure, tunnel engineering, VRD, BIM: Systra<br \/>Light structure, fa\u00e7ade: VPGreen<br \/>Economist: Tohier<br \/>Acoustics: Kahle Acoustics<br \/>Lighting: Light Cibles<br \/>Fire safety, accessibility: Casso<\/p>\n<p><strong>COMPETITION<br \/><\/strong>Elsa Briot<\/p>\n<p><strong>STUDIES<br \/><\/strong>Jean-Fran\u00e7ois Vaudeville<br \/>Anne Pestel<br \/>Aimie Calvet<br \/>Sara Averardi<br \/>Jean-Charles Luciani<strong><br \/><\/strong><\/p><\/div>\n\t\t\t<\/div><div class=\"et_pb_with_border et_pb_module et_pb_image et_pb_image_5 carrousel-cell\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<span class=\"et_pb_image_wrap \"><img decoding=\"async\" src=\"https:\/\/anma.fr\/wp-content\/uploads\/2020\/07\/\u00a9Nicolas-Grosmond-CREtEIL-LECHAT_ANMA-FEV2025-09143.jpg\" alt=\"ANMA Cr\u00e9teil Gare de Cr\u00e9teil l&amp;apos;\u00c9chat\" title=\"CLE metro worksite\" \/><\/span>\n\t\t\t<\/div><div class=\"et_pb_module et_pb_text et_pb_text_5 carrousel-cell  et_pb_text_align_left et_pb_bg_layout_light\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"et_pb_text_inner\"><h2><strong>TECHNICAL<\/strong> SHEET<\/h2>\n<p>&nbsp;<\/p>\n<p><strong>STATUS <\/strong>Under construction<\/p>\n<p><strong>COMMISSIONED BY<\/strong>Soci\u00e9t\u00e9 du Grand Paris<\/p>\n<p><strong>CALENDAR <\/strong>2026<\/p>\n<p><strong>SURFACE <\/strong>Site 11 150 m\u00b2, 8 700 m\u00b2 SHON<\/p>\n<p><strong>VISUALIZATION<\/strong>Inui, Plasticine<\/p>\n<p>&nbsp;<\/p>\n<p><strong>SEE +<br \/><\/strong><a href=\"https:\/\/anma.fr\/projets\/cours-saint-laud\/\">Angers, Cours Saint-Laud<\/a><br \/><a href=\"https:\/\/anma.fr\/projets\/lorient-odyssee\/\">Lorient, Lorient Odyss\u00e9e<\/a><br \/><a href=\"https:\/\/anma.fr\/projets\/gare-de-saint-maur-creteil\/\">Saint-Maur, Gare de Saint-Maur Cr\u00e9teil<\/a><\/p><\/div>\n\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\t\t<\/div>\n\t<\/div>\n\t","protected":false},"excerpt":{"rendered":"<p>a lever forurban renewal &nbsp; In connection with the Cr\u00e9teil subway station, the new Grand Paris Express Cr\u00e9teil-\u00c9chat station will allow an urban redevelopment of a sector suffering from a lack of programmatic diversity and a predominance of road infrastructure. In addition to the multiplicity of access to the various city&#8217;s facilities, such as the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":245739,"parent":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"metier":[490],"ville":[528],"prog":[501],"statut":[496],"annee":[525],"intervention":[483,485],"class_list":["post-252048","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":{"choix_de_la_couleur_du_titre":"#000000"},"_links":{"self":[{"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project\/252048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/comments?post=252048"}],"version-history":[{"count":3,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project\/252048\/revisions"}],"predecessor-version":[{"id":260604,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project\/252048\/revisions\/260604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/media\/245739"}],"wp:attachment":[{"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/media?parent=252048"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project_category?post=252048"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/project_tag?post=252048"},{"taxonomy":"metier","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/metier?post=252048"},{"taxonomy":"ville","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/ville?post=252048"},{"taxonomy":"prog","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/prog?post=252048"},{"taxonomy":"statut","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/statut?post=252048"},{"taxonomy":"annee","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/annee?post=252048"},{"taxonomy":"intervention","embeddable":true,"href":"https:\/\/anma.fr\/en\/wp-json\/wp\/v2\/intervention?post=252048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}